beltsupportPSPThe R.M. Schahfer Station coal-fired plant handles large quantities of synthetic gypsum as part of its process. The material is transported by conveyor, but the OEM system was experiencing fugitive material problems, with dust and spillage piling up and large chunks of gypsum falling off the belt. The belt was experiencing these issues at several points, forcing the maintenance team to spend significant man-hours cleaning up material and placing employees in potentially hazardous situations by working in close proximity to a moving conveyor.

Solution

conveyorspillagelackofbeltsupportMartin technicians determined that inadequate belt support was the primary cause of the problem, allowing material to escape from the transfer point’s loading zone. They proposed installing a series of Martin® Slider Cradles and Martin® Impact Cradles with center support rollers to improve sealing, reduce fugitive material, and help prevent further belt damage. Martin Engineering supplies a variety of belt support components specifically engineered to prevent belt and mainframe damage and eliminate spillage.

Results

Results_beltsupportPSPWith proper impact absorption and distribution, the force of the material transfer is cushioned and the gypsum’s momentum is better controlled, helping to prevent the violent disruption of the load that led to spillage. Instead, the impact cradles absorbed a majority of the energy, and the slider cradles stabilized the material along the entire length of the loading zone. The sealing system now works far more effectively, and the cleanup time around the conveyor has been dramatically reduced. The customer is very happy with the results and is now able to direct the previously wasted manpower toward more productive tasks.

Download Our Foundations Book

<<View All